This degree project presents a reliability analysis that evaluates the feasibility of a 500 kV MTDC network using power systems based on voltage source converter stations (VSC) for an interconnection between Colombia, Venezuela and Panama. Using the NEPLAN software, simulations were carried out between the Colectora II, Hidrosogamoso, La Tasajera and Quimbo nodes in Colombia, an interconnection between Colombia and Panama between the Tasajera node with Llano Sánchez and Colombia with Venezuela between the Cuatricentenario node with Hidrosogamoso. The use of bipolar VSC and symmetric monopolar VSC conversion stations in the national interconnection system will be evaluated.
Resumen en español
El presente proyecto de grado presenta un análisis de confiabilidad que evalúa la factibilidad de una red MTDC de 500 kV utilizando sistemas de energía basados en estaciones convertidoras de fuentes de tensión (VSC) para una interconexión entre Colombia, Venezuela y Panamá. Por medio del software NEPLAN se realizó simulaciones entre los nodos de Colectora II, Hidrosogamoso, la Tasajera y Quimbo en Colombia, una interconexión entre Colombia con Panamá entre el nodo de la Tasajera con llano Sánchez y Colombia con Venezuela entre el nodo de Cuatricentenario con Hidrosogamoso. Se evaluará el uso de estaciones de conversión VSC bipolares y VSC monopolar simétrica en el sistema de interconexión nacional.